Question: Your project is in need of 2 1 , 0 0 0 B C Y of fill material. There are two sites ( A and
Your project is in need of of fill material. There are two sites A and B available for
obtaining fill material for your project. The ExcavatorLoader is available to load the trucks at the
fill sites. The truck for each site will haul the material to your site as listed below. It will take about
minutes for either truck to unloaddump the soil.
a Determine the total cycle time in minutes for each type of haul, where cycle time in each
case includes the load, haul, dump, and return times.
b How many trucks for each sites would optimize the cycle? What is the production rate for
each and what controls the production rate for each case? What is the haultime for
for each case? What is the total truck round trips to each site?
c Determine the cost of obtaining fill from each site and recommend a site based on total cost.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock