Question: Your project scope requires that you construct a compacted fill embankment that contains 4 5 0 , 0 0 0 C Y of fill. There
Your project scope requires that you construct a compacted fill embankment that contains of fill. There is no suitable fill material on site so you are required to import haul in material from a borrow pit that is miles away. The borrow material is a clay soil.
a How many of material are you required to excavate at the borrow pit?
b How many loose cubic yards of material are required to be hauled?
c How many truckloads are required if the trucks have a capacity of per load?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock