Question Answers
Textbooks
Find textbooks, questions and answers
Oops, something went wrong!
Change your search query and then try again
S
Books
FREE
Study Help
Expert Questions
Accounting
General Management
Mathematics
Finance
Organizational Behaviour
Law
Physics
Operating System
Management Leadership
Sociology
Programming
Marketing
Database
Computer Network
Economics
Textbooks Solutions
Accounting
Managerial Accounting
Management Leadership
Cost Accounting
Statistics
Business Law
Corporate Finance
Finance
Economics
Auditing
Hire a Tutor
AI Tutor
AI Flashcards
FREE
Search
Search
Sign In
Register
study help
sciences
construction methods management
Construction Methods and Management 7th edition Stephens W. Nunnally - Solutions
Write a computer program to determine the height and base width (feet or meters) of the triangular spoil bank that will result from a rectangular trench excavation. Input should include the ditch
Use the profile and mass diagram of Figure 2–6 to find the following values.a. The total volume of (1) cut, (2) fill, (3) waste, and (4) borrow .b. The average length of haul for section 3.Figure
Using Table 2–1, how many working minutes per hour would you expect to achieve on a project whose job conditions and management conditions are both rated poor?Table 2-1:
Calculate the volume of excavation in bank measure required for the basement shown in Figure 2–7. Excavation depths are in feet (meters).Figure 2-7:
Write a computer program to determine the height and base width (feet or meters) of the triangular spoil bank that will result from a rectangular trench excavation. Input should include the ditch
A sample of gravel from a stockpile weighs 15 lb (6.80 kg). After oven drying, the sample weighs 14.2 lb (6.44 kg). Calculate the moisture content of the sample.
A soil weighs 2500 lb/cu yd (1483 kg/m3) loose, 3100 lb/cu yd (1839 kg/m3) in its natural state, and 3650 lb/cu yd (2106 kg/m3) compacted. Find this soil’ s load factor and shrinkage factor.
Use the profile and mass diagram of Figure 2–6 to find the following values.a. The total volume of (1) cut, (2) fill, (3) waste, and (4) borrow .b. The average length of haul for section 3.Figure:
Using Table 2–1, how many working minutes per hour would you expect to achieve on a project whose job conditions and management conditions are both rated poor?Table 2 -1:
How many truckloads of trucks hauling an average volume of 6 LCY (4.6 LCM) would be required to haul 1 million CCY (764 600 CCM) of the soil of Problem 7 to a dam site?
A rectangular ditch having a cross-sectional area of 24 sq ft (2.2 m2) is being excavated in clay . The soil’ s angle of repose is 35° and its swell is 30%. Find the height and width of the
In making a field identification test of a soil, you find that less that 50% by weight of the coarse fraction is less than 1/4 in. (6mm) in size. The fine fraction of the soil exhibits low dry
A 1000-ft (305-m)-long pipeline requires an excavation 4 ft (1.2 m) wide to an aver-age depth of 5 ft (1.5 m). If the soil is dry common earth, what size spoil bank will be created by the excavation?
Calculate the volume of excavation in bank measure required for the basement shown in Figure 2–7. Excavation depths are in feet (meters).Figure 2-7
Describe three specific construction applications of a personal computer that you believe would be valuable to a construction professional.
A 1000-ft (305-m)-long pipeline requires an excavation 4 ft (1.2 m) wide to an aver-age depth of 5 ft (1.5 m). If the soil is dry common earth, what size spoil bank will be created by the excavation?
In making a field identification test of a soil, you find that less that 50% by weight of the coarse fraction is less than 1⁄4 in. (6 mm) in size. The fine fraction of the soil exhibits low dry
A rectangular ditch having a cross-sectional area of 24 sq ft (2.2 m2) is being excavated in clay . The soil’ s angle of repose is 35° and its swell is 30%. Find the height and width of the
How many truckloads of trucks hauling an average volume of 6 LCY (4.6 LCM) would be required to haul 1 million CCY (764 600 CCM) of the soil of Problem 7 to a dam site?
Asoil weighs 2500 lb/cu yd (1483 kg/m3) loose, 3100 lb/cu yd (1839 kg/m3) in its natural state, and 3650 lb/cu yd (2106 kg/m3) compacted. Find this soil’s load factor and shrinkage factor .
A sample of gravel from a stockpile weighs 15 lb (6.80 kg). After oven drying, the sample weighs 14.2 lb (6.44 kg). Calculate the moisture content of the sample.
Briefly explain the difference between construction utilizing a conventional construction contract and construction utilizing a construction management contract.
What category of construction makes up the largest component of new U.S. construc-tion volume?
Identify those construction operations that account for a majority of serious construction injuries.
Explain the meaning of the term horizontal construction.
Recognizing the importance of construction quality control, what steps do you suggest an owner take to assure delivery of a satisfactory facility?
Section 1–4 enumerates several ways in which productivity can be improved during construction. Select two of these items and briefly discuss how their application could improve productivity and
What codes and regulations are likely to apply to a building construction project?
Describe the principal objectives that a construction manager should have when carrying out a construction project.
Briefly describe at least three likely results of poor construction project management.
Step by Step Answers