Question: As part of the quality-control program for a catalyst manufacturing line, the raw materials (alumina and a binder) are tested for purity. The process requires
As part of the quality-control program for a catalyst manufacturing line, the raw materials (alumina and a binder) are tested for purity. The process requires that the purity of the alumina be greater than 85%. A random sample from a recent shipment of alumina yielded the following results (in percent):
?
A hypothesis test will be done to determine whether or not to accept the shipment.
a. State the appropriate null and alternate hypotheses.
b. Compute the P-value.
c. Should the shipment be accepted? Explain.
93.2 87.0 92.1 90.1 87.3 93.6
Step by Step Solution
3.39 Rating (168 Votes )
There are 3 Steps involved in it
a H 0 85 versus H 1 85 b X 9055 s 2901551 n 6 There are 6 1 5 degrees of freedo... View full answer
Get step-by-step solutions from verified subject matter experts
