A project developed in PL/1 is expected to take 30 months. Assuming the same ratios as those
Question:
A project developed in PL/1 is expected to take 30 months. Assuming the same ratios as those shown in the table below, compare the duration, level of effort, and software size between a project developed in PL/1 and a project developed in an object-oriented language comparable to Smalltalk.
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Related Book For
Introduction To Systems Analysis And Design
ISBN: 9780073402949
1st Edition
Authors: Jeffrey Whitten, Lonnie Bentley
Question Posted: