Question: Rework Example 3.12 for a $+10 %$ tap, providing a $10 %$ increase for the high-voltage winding. Data From Example 3.12:- A three-phase generator step-up

Rework Example 3.12 for a $+10 %$ tap, providing a $10 %$ increase for the high-voltage winding.

Data From Example 3.12:-

A three-phase generator step-up transformer is rated 1000 MVA, 13.8 kV A/345

A three-phase generator step-up transformer is rated 1000 MVA, 13.8 kV A/345 kV Y with Zeq = j0.10 per unit. The transformer high-voltage wind- ing has +10% taps. The system base quantities are Sbase 3 = 500 MVA VbaseXLL 13.8 kV VbaseHLL 345 kV Determine the per-unit equivalent circuit for the following tap settings: a. Rated tap b. -10% tap (providing a 10% voltage decrease for the high-voltage winding) Assume balanced positive-sequence operation. Neglect transformer winding resistance, exciting current, and phase shift.

Step by Step Solution

3.43 Rating (156 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

To rework Example 312 for a 10 tap providing a 10 increase for the highv... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Systems Analysis And Design Questions!