Question: A safety PLC communicates shutdown status to the operator via a communication link. If this link fails to communicate, how would that failure mode be

A safety PLC communicates shutdown status to the operator via a communication link. If this link fails to communicate, how would that failure mode be classified?

Step by Step Solution

3.59 Rating (149 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

In a safety system where a safety PLC Programmable Logic Controller communicates shutdown status to the operator through a communication link the fail... View full answer