Question: Suppose that back in the 1970s, Steve was asked to build speakers for two friends. The first friend, Jan, needed a speaker for her band.
Suppose that back in the 1970s, Steve was asked to build speakers for two friends. The first friend, Jan, needed a speaker for her band. The second friend, Ed, needed a speaker built into the back of his hatchback automobile. Steve figured the following costs for each:
.png)
Steve knew that Jans job would be easier, since he had experience in building the type of speaker she needed. Her job would not require any special equipment or specialized fitting. Eds job, on the other hand, required specialized design and precise fitting. Steve thought he might need to build a mock-up of the speaker first, to fit it into the space. In addition, he might have to add to his tool collection to complete the job. Normally, Steve figured a wage rate of $6 per hour and charged 20 percent of labor and materials as an overhead rate.
Required:
1. Prepare job-order cost sheets for the two jobs, showing total cost.
2. Which cost do you think is more likely to be accurate? How might Steve build in some of the uncertainty of Eds job into a budgetedcost?
Materials Labor hours Jan's Job $50 10 Ed's Job $75 20
Step by Step Solution
3.39 Rating (171 Votes )
There are 3 Steps involved in it
1 Jans Job Eds Job Materials 50 75 Direct labor 60 120 Applied overhead 020 50 60 22 020 75 120 3... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
94-B-M-A-J-O-C (277).docx
120 KBs Word File