Question: The primary control loop of a nuclear power plant includes a time delay due to the need to transport the fluid from the reactor to
-1.png)
The transfer function of the reactor and time delay is
-2.png)
where T = 0.4 s and T = 0.2 s. Using frequency response methods, design the controller so that the overshoot of the system is P.O. ¤ 10%. With this controller in the loop, estimate the percent overshoot and settling time (with a 2% criterion) to a unit step. Determine the actual overshoot and settling time and compare with the estimated values.
KI Ts 1
Step by Step Solution
3.40 Rating (162 Votes )
There are 3 Steps involved in it
A time domain step response specification PO 10 requires the dominant poles t... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
835-C-S-S-A-D (2002).docx
120 KBs Word File