Question: The primary control loop of a nuclear power plant includes a time delay due to the need to transport the fluid from the reactor to

The primary control loop of a nuclear power plant includes a time delay due to the need to transport the fluid from the reactor to the measurement point. The transfer function of the controller is
The primary control loop of a nuclear power plant includes

The transfer function of the reactor and time delay is

The primary control loop of a nuclear power plant includes

where T = 0.4 s and T = 0.2 s. Using frequency response methods, design the controller so that the overshoot of the system is P.O. ‰¤ 10%. With this controller in the loop, estimate the percent overshoot and settling time (with a 2% criterion) to a unit step. Determine the actual overshoot and settling time and compare with the estimated values.

KI Ts 1

Step by Step Solution

3.40 Rating (162 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

A time domain step response specification PO 10 requires the dominant poles t... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (1 attachment)

Word file Icon

835-C-S-S-A-D (2002).docx

120 KBs Word File

Students Have Also Explored These Related Systems Analysis And Design Questions!