Question: TriTech Company has been allocating overhead to individual product lines based on each line's relative shares of direct labor hours. For the upcoming year, the

TriTech Company has been allocating overhead to individual product lines based on each line's relative shares of direct labor hours. For the upcoming year, the company estimated that manufacturing overhead will be $1,800,000 and estimated direct labor hours will be 120,000. The company also has the following estimates:

Total Amount Total Amount Cost Driver Direct labor hours Number of setups Number of design changes Cost Pool of Activity

Among many other products, TriTech has two switches, Standard and Elite switches. Standard switches are a high-volume product that the company makes in large batches, while Elite switches are a specialty product that is fairly low in sales volume.
Information about Standard and Elite usage of the different activities follows:
.................................................Standard .....................Elite
Direct labor hours .................................3,000 .....................300
Number of setups .......................................1....................... 14
Number of design changes .............................2 .......................20
Required
a. Calculate the predetermined overhead rate based on direct labor hours (traditional allocation). Use this predetermined overhead rate to calculate the amount of overhead to apply to Standard and Elite switches, based on their usage of direct labor hours.
b. Calculate the individual ABC pool rates by taking the total amount of overhead for each cost pool and dividing that total by the total amount of activity for that pool. Allocate overhead to each of the two products using these three activity rates.
c. Compare the overhead calculated in part a to that calculated in part b. Why are they different? Which allocation method (traditional or ABC) most likely results in a better estimate of product cost?

Total Amount Total Amount Cost Driver Direct labor hours Number of setups Number of design changes Cost Pool of Activity 120,000 200 Maintenance costs Setup costs Engineering costs $ 700,000 500,000 600,000 400 $1,800,000

Step by Step Solution

3.43 Rating (178 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

a Calculate predetermined overhead rate based on DLH Estimated MOH a 1800000 Estimated DLH b 120000 ... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (1 attachment)

Word file Icon

1327-B-M-A-J-O-C(4452).docx

120 KBs Word File

Students Have Also Explored These Related Managerial Accounting Questions!