Question: A concrete dam rests on an alluvial solid foundation as shown in the scale drawing of Figure P7.8.4. Estimate the seepage rate (in m3/ day)
P7.8.4. Estimate the seepage rate (in m3/ day) for the 100-m-long dam if the permeability is 4 .45 X 10-7 m/sec and the upstream water depth is 20 m. Also estimate the energy head (using) the dam bottom as the datum) and the seepage velocity immediately below the middle of the dam. The soil porosity is 0.45.
.png)
30 m Im Figure P7.84
Step by Step Solution
3.22 Rating (163 Votes )
There are 3 Steps involved in it
A flow net is sketched on the figure in the book giving 3 flow lines 6 equipotential drops A... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
884-P-M-F-M (955).docx
120 KBs Word File
