A contractor builds three types of houses: the Aries, the Belfair, and the Wexford. Each house requires
Question:
(a) Building how many of each type of house will maximize his profit?
(b) What is the maximum possible profit?
Involve three variables. Solve them with the simplex method, Excel, or some other technology.