Question: We wish to find a single-sampling plan for a situation where lots are shipped from a supplier. The suppliers process operates at a fallout level
We wish to find a single-sampling plan for a situation where lots are shipped from a supplier. The supplier’s process operates at a fallout level of 0.50% defective. We want the
from the inspection activity to be 3%.
a. Find the appropriate Dodge–Romig plan.
b. Draw the
curve and the
curve for this plan. How much inspection will be necessary, on the average, if the supplier’s process operates close to the average fallout level?
c. What is the LTD protection for this plan?
AOQL
Step by Step Solution
3.39 Rating (174 Votes )
There are 3 Steps involved in it
a DodgeRomig single sampling average process fallout defective From Table 78 minimum sampling ... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
552-M-S-Q-C-B-S (404).docx
120 KBs Word File
