Question: A list of 16 issues that led to incorrect formulations in Richard Dulskis jam manufacturing unit is provided below: 1. Incorrect measurement 2. Antiquated scales
A list of 16 issues that led to incorrect formulations in Richard Dulski’s jam manufacturing unit is provided below:
1. Incorrect measurement
2. Antiquated scales
3. Lack of clear instructions
4. Damaged raw material
5. Operator misreads display
6. Inadequate cleanup
7. Incorrect maintenance
8. Inadequate flow controls
9. Variability
10. Equipment in disrepair
11. Technician calculation off
12. Jars mislabeled
13. Temperature controls off
14. Incorrect weights
15. Priority miscommunication
16. Inadequate instructions
Create a fish-bone diagram and categorize each of these issues correctly, using the “four Ms” method.
Step by Step Solution
3.33 Rating (180 Votes )
There are 3 Steps involved in it
Manporter Incorrect measurement Operator misreads display Jars mislabeled Incorre... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
256-B-M-L-O-M (1533).docx
120 KBs Word File
