Question: A total of 5000 mechanical subassemblies are needed annually on a final assembly line. The subassemblies can be obtained in one of three ways: (1)

A total of 5000 mechanical subassemblies are needed annually on a final assembly line. The subassemblies can be obtained in one of three ways: (1) Make them in one of three plants owned by the company; (2) buy them off the shelf from the one and only manufacturer; or (3) contract to have them made to specifications by a vendor.

The estimated annual equivalent cost for each alternative is dependent upon specific circumstances of the plant, producer, or contractor. The information shown details the circumstance, a probability of occurrence, and the estimated annual cost.

Construct and solve a decision tree to determine the least-cost alternative to provide thesubassemblies.

A total of 5000 mechanical subassemblies are needed annually on

Decision Alternative Annual Cost for 5000 Units, S per Year Outcomes Probability 1. Make Plant 0.3 0.5 0.2 -250,000 -400,000 -350,000 2. By off Quantity the shelf 5000, forced to buy 0.2 0.7 0.1 -550,000 -250,000 -290.000 3. Contract Delivery: Timely delivery Late delivery, then 0.5 0.5 -175,000 -450,000 buy some off shelf

Step by Step Solution

3.37 Rating (156 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

Select the minimum Ecost alternative All monetary units ... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (1 attachment)

Word file Icon

217-B-E-M (1815).docx

120 KBs Word File

Students Have Also Explored These Related Economics Questions!