Question: All At Dalton Playground Equipment, the powder-coating process is a bottleneck. Typically, it takes approximately two hours to switch between jobs. The time is spent

All At Dalton Playground Equipment, the powder-coating process is a bottleneck. Typically, it takes approximately two hours to switch between jobs. The time is spent cleaning nozzles and paint tanks and recalibrating equipment. Currently the company runs relatively small batch sizes through the process but is considering increasing them to reduce setup time.
With small batch sizes, powder coating can process approximately 2,000 units per 8-hour shift, and products have an average contribution margin of $50. With large batch sizes, powder coating can process approximately 2,300 units per 8-hour shift.

Required
a. Calculate the additional profit associated with running larger batch sizes through the powder-coating process.
b. What potential problems are created by the larger batch sizes?

Step by Step Solution

3.46 Rating (159 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

a Additional units in 8 hour shift 300 Times average contribution ... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (1 attachment)

Word file Icon

259-B-M-A-D-M (1068).docx

120 KBs Word File

Students Have Also Explored These Related Managerial Accounting Questions!