Question: An alternative mining plan is to develop two levels, below the upper A Level, and mine only the high grade. The B Level would be
An alternative mining plan is to develop two levels, below the upper A Level, and mine only the high grade. The B Level would be in the 43 ft of high grade, while the C level would be in the lower 20 ft of high grade in the 102 ft column shown in the detailed geologic column. Determine the maximum possible roof span for the B Level.
Step by Step Solution
3.49 Rating (172 Votes )
There are 3 Steps involved in it
Given New mining plan Problem 32 18 11 14 43 25 20 Find Lmax BLevel Bonneterre ... View full answer
Get step-by-step solutions from verified subject matter experts