Question: An article in IEEE Transactions (Mar. 1990) gave an example of a flexible manufacturing system with four machines operating independently. The repair rates for the
a. Find the probability that the repair time for machine 1 exceeds 1 hour.
b. Repeat part a for machine 2.
c. Repeat part a for machines 3 and 4.
d. If all four machines fail simultaneously, find the probability that the repair time for the entire system exceeds 1 hour.
Step by Step Solution
3.29 Rating (173 Votes )
There are 3 Steps involved in it
a Let x 1 repair time for machine 1 Then x 1 has an exponential distribution with 1 1 hour P x 1 ... View full answer