Question: An operations manager who supervises an assembly line has been experiencing problems with the sequencing of jobs. The problem is that bottlenecks are occurring because
An operations manager who supervises an assembly line has been experiencing problems with the sequencing of jobs. The problem is that bottlenecks are occurring because of the inconsistency of sequential operations. He decides to conduct an experiment wherein two different methods are used to complete the same task. He measures the times (in seconds). The data are listed here. Can he infer that the second method is more consistent than the firstmethod?
.png)
Method 1 8.8 9.6 8.4 9.0 8.3 9.2 9.0 8.7 8.5 9.4 Method 2 9.2 9.4 8.9 9.6 9.7 8.4 8.8 8.9 9.0 9.7
Step by Step Solution
3.41 Rating (167 Votes )
There are 3 Steps involved in it
There is not enough evidenc... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
398-M-S-O-T-P (282).docx