Question: Assume you are a project cost engineer calculating the cost of a repetitive activity for your project. There are a total of 20 iterations of

Assume you are a project cost engineer calculating the cost of a repetitive activity for your project. There are a total of 20 iterations of this activity required for the project. The project activity takes 2.5 hours at its steady state rate and the learning rate is 75%. Calculate the initial output time for the first unit produced, using the learning curve formula:
Yx = aXb
Where:
Yx = the time required for the steady state, x, unit of output
a = the time required for the initial unit of output
X = the number of units to be produced to reach the steady state
b = the slope of the learning curve, represented as: log decimal learning rate/log 2

Step by Step Solution

3.49 Rating (159 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

Use the formula to first determin... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (1 attachment)

Word file Icon

663-B-M-L-P-M (2103).docx

120 KBs Word File

Students Have Also Explored These Related Management Leadership Questions!