Question: Build a 2S/t + O versus O relationship in 0.2-m increments for a pond that is expected to reach a depth of 1.0 m over

Build a 2S/∆t + O versus O relationship in 0.2-m increments for a pond that is expected to reach a depth of 1.0 m over the top of the service spillway (normal pond level). The elevation-storage relationship for the pond is described by S = 600 h1.2, where S = storage in the pond in m3 and h = water level in meters above the service spillway. The discharge over the spillway is described by O = kwL(2g)0.5 h1.5, where O = discharge in m3/sec, kw = 0.45 (discharge coefficient), L = 0.3 m (spillway crest length), and g = gravitational acceleration. Initially, h = 0 and S = 0, and the routing interval (∆t) is 8 minutes.

Step by Step Solution

3.33 Rating (168 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

The 2StO vs O relationship is tabulated below whe... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (1 attachment)

Word file Icon

884-P-M-F-M (1117).docx

120 KBs Word File

Students Have Also Explored These Related Mechanics Questions!