Question: Consider the following network for a small maintenance project (all times are in days; network proceeds from node 1 to node 7): a. Draw an
Consider the following network for a small maintenance project (all times are in days; network proceeds from node 1 to node 7):
a. Draw an arrow diagram representing the project.
b. What is the critical path and associated time?
.png)
c. What is the total slack time in the network?
d. What is the expected time for 68, 95, and 99 percent completion limits?
e. If activity G had an estimated time of fifteen days, what impact would this have on your answer to partb?
255323950230 366434564344 144212746126 ina od 243644567577 111223344456 JA ! ABCDEFGHIJKL
Step by Step Solution
3.47 Rating (170 Votes )
There are 3 Steps involved in it
a b c d Limit Range Outer Limit 1 68 23 145 2445 ... View full answer