Question: Design a schedule of work sampling observations in which eight observations are made during one eight- hour day (use 0: 00 to 7: 59). Using
Design a schedule of work sampling observations in which eight observations are made during one eight- hour day (use 0: 00 to 7: 59). Using Table, read the last digit going down column 4 for hours (e. g., 17446 . . .), and read across row 3 from left to right in sets of two for minutes (e. g., 47 15 24 86 . . .). Arrange the times chronologically.
Step by Step Solution
3.23 Rating (155 Votes )
There are 3 Steps involved in it
Given Use the random number table in Chapter 7 to design a schedule of work sampling observations in ... View full answer