Determine the flow rate in Problem 8. 9.3 if the outlet was not submerged. Problem 8.9.3 Stage

Question:

Determine the flow rate in Problem 8. 9.3 if the outlet was not submerged.
Problem 8.9.3
Stage recorders have registered stream depths upstream (4.05 m) and downstream (3.98 m) of a culvert during a flood event. The 2 m by 2 m concrete culvert (square-edged entrance) is 15 m long and has a slope of 3.0 percent. Based on this information, determine the flood flow rate that passed through the culvert. Assume the stream depths are measured above the culvert inverts on the upstream and downstream ends.