Question: Develop a net material requirements plan for the TOL and HQ file cabinets in the previous problems assuming a current on-hand finished goods inventory of
Painting and final assembly of both HQ and TOL requires 2 weeks.
Both cabinet frames and lock assembly require 1 week for manufacturing.
Both drawer assemblies require 2 weeks for assembly.
Both sliding assemblies require 2 weeks for manufacturing.
Bearings require 2 week to arrive from the supplier.
Step by Step Solution
3.47 Rating (167 Votes )
There are 3 Steps involved in it
Week 1 2 3 4 5 6 7 8 9 10 Lead Time TOL Required date Order releas... View full answer