Question: Develop your own waiting line simulation model for the Black Sheep Scarves problem described in Section 12.3. Assume that a quality inspection department for a

Develop your own waiting line simulation model for the Black Sheep Scarves problem described in Section 12.3. Assume that a quality inspection department for a new production facility is expected to check scarves with times uniformly distributed between 0 and 4 minutes. The service times of the quality inspection are anticipated to be normal, with a mean of 2 minutes and a standard deviation of 0.5 minutes. Simulate the operation of this system for 1000 scarves using one quality inspector. Discard the first 100 scarves and collect data over the next 900 scarves. What is your assessment of the ability to operate with one quality inspector? What happens to the average waiting time for scarves near the end of the simulation period?

Step by Step Solution

3.45 Rating (165 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

Use the Black Sheep Scarves spreadsheet Changing the interarri... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (1 attachment)

Word file Icon

1098-M-S-L-P(1599).docx

120 KBs Word File

Students Have Also Explored These Related Statistics Questions!