Question: Engineers at a computer production plant tested two methods for accuracy in drilling holes into a PC board. They tested how fast they could set

Engineers at a computer production plant tested two methods for accuracy in drilling holes into a PC board. They tested how fast they could set the drilling machine by running 10 boards at each of two different speeds. To assess the results, they measured the distance (in inches) from the center of a target on the board to the center of the hole. The data and summary statistics are shown in the table.
Engineers at a computer production plant tested two methods for

Write a report summarizing the findings of the experiment. Include appropriate visual and verbal displays of the distributions, and make a recommendation to the engineers if they are most interested in the accuracy of the method.

Fast 0.000101 0.000102 0.000100 0.000102 0.000101 Slow 0.000098 0.000096 0.000097 0.000095 0.000094 0000103 0.000098 0.000104 0.000102 0.000096 0.975600 0.000102 0.00097 Mean StdDev 0.000100 0.000102 0.000001 0.000096 0.097647 0.308481

Step by Step Solution

3.36 Rating (159 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

The slow drilling data contains an extremely high outlier indicating that one hole was drilled almos... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (1 attachment)

Word file Icon

452-M-S-D-A (1453).docx

120 KBs Word File

Students Have Also Explored These Related Statistics Questions!