Question: Engineers at a computer production plant tested two methods for accuracy in drilling holes into a PC board. They tested how fast they could set
.png)
Write a report summarizing the findings of the experiment. Include appropriate visual and verbal displays of the distributions, and make a recommendation to the engineers if they are most interested in the accuracy of the method.
Fast 0.000101 0.000102 0.000100 0.000102 0.000101 Slow 0.000098 0.000096 0.000097 0.000095 0.000094 0000103 0.000098 0.000104 0.000102 0.000096 0.975600 0.000102 0.00097 Mean StdDev 0.000100 0.000102 0.000001 0.000096 0.097647 0.308481
Step by Step Solution
3.36 Rating (159 Votes )
There are 3 Steps involved in it
The slow drilling data contains an extremely high outlier indicating that one hole was drilled almos... View full answer