Engineers at a computer production plant tested two methods for accuracy in drilling holes into a PC

Question:

Engineers at a computer production plant tested two methods for accuracy in drilling holes into a PC board. They tested how fast they could set the drilling machine by running 10 boards at each of two different speeds. To assess the results, they measured the distance (in inches) from the center of a target on the board to the center of the hole. The data and summary statistics are shown in the table.
Engineers at a computer production plant tested two methods for

Write a report summarizing the findings of the experiment. Include appropriate visual and verbal displays of the distributions, and make a recommendation to the engineers if they are most interested in the accuracy of the method.

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question

Business Statistics

ISBN: 9780321925831

3rd Edition

Authors: Norean Sharpe, Richard Veaux, Paul Velleman

Question Posted: