Question: Engineers at a computer production plant tested two methods for accuracy in drilling holes into a PC board. They tested how fast they could set
.png)
Write a report summarizing the findings of the experiment. Include appropriate visual and verbal displays of the distributions, and make a recommendation to the engineers if they are most interested in the accuracy of the method.
Distance (in.) SpeedDistance (in.) Speed 0.000101 Fast 0.000102 Fast 0.000100 Fast 0.000102 Fast 0.000101 Fast 0.000103 Fast 0.000104 Fast 0.000102 Fast 0.000102 Fast 0.000100 Fast 0.000098 Slow 0.000096 Slow 0.000097 Slow 0.000095 Slow 0.000094 Slow 0.000098 Slow 0.000096 Slow 0.975600 Slow 0.000097 Slow 0.000096 Slow 0.097647 0.308481 Mean 0.000102 StdDev 0.000001
Step by Step Solution
3.36 Rating (168 Votes )
There are 3 Steps involved in it
First of all there is an extreme outlier in the distribution of distances for the slow speed drillin... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
662-M-S-D-A (7180).docx
120 KBs Word File
