Question: Exeter Corporation has recently begun a continuous improvement campaign. As a consequence, there have been many changes in operating procedures. Progress has been slow, particularly
Exeter Corporation has recently begun a continuous improvement campaign. As a consequence, there have been many changes in operating procedures. Progress has been slow, particularly in trying to develop new performance measures for the factory. Management has been gathering the following data over the past four months:
-1.png)
The president has attended conferences at which the importance of throughput time, manufacturing cycle efficiency, and delivery cycle time were stressed, but no one at the company is sure how they are computed. The data to compute these measures have been gathered and appear below:
-2.png)
Required:
1. For each month, compute the following operating performance measures:
a. Throughput time.
b. Manufacturing cycle efficiency (MCE).
c. Delivery cycle time.
2. Using the performance measures given in the problem and those you computed in (1) above, do the following:
a. Identify areas where the company seems to be improving.
b. Identify areas where the company seems to be deteriorating or stagnating.
c. Explain why you think some specific areas are improving while others are not.
3. Refer to the move time, process time, and so forth, given above for month 4.
a. Assume that in month 5 the move time, process time, and so forth, are the same as for month 4, except that through the implementation of lean production, the company is able to completely eliminate the queue time during production. Compute the new throughput time and MCE.
b. Assume that in month 6 the move time, process time, and so forth, are the same as for month
4, except that the company is able to completely eliminate both the queue time during production and the inspection time. Compute the new throughput time andMCE.
Month 3 Quality control measures: Customer complaints as a percentage of units sold warranty claims as a percentage of units sold Defects as a percentage of units produced 1.4% 2.3% 4.6% 1.3% 2.1% 4.2% 1.1% 2.0% 3.7% 1.0% 1.8% 3.4% Material control measures Scrap as a percentage of total cost 3.2% 2.9% 3.0% 2.7% Machine performance measures Percentage of machine availability Use as a percentage of availability.. Average setup time (hours) 80% 75% 82% 73% 81% 71% 2 79% 70% 2.7 2.5 2.5 Delivery performance measures Throughput time Manufacturing cycle efficiency Delivery cycle time Percentage of on-time deliveries 84% 87% 91% 95% Month Wait time per order before start of production, in days 16.7 15.2 12.3 9.6 Inspection time per unit, in days Process time per unit, in days Queue time per unit, in days. 5.7 5.6 5.7 Move time per unit in days 0.6 0.6 06 0.6 1.4 1.3 1.3 1.4
Step by Step Solution
3.46 Rating (166 Votes )
There are 3 Steps involved in it
1 a b and c Month 1 2 3 4 Throughput time in days Process time 06 06 06 06 Inspection time 01 03 06 08 Move time 14 13 13 14 Queue time 56 57 56 57 To... View full answer