Question: Five batch jobs. A through E, arrive at a computer center at almost the same time. They have estimated running times of 10, 6, 2,

Five batch jobs. A through E, arrive at a computer center at almost the same time. They have estimated running times of 10, 6, 2, 4, and 8 minutes. Their (externally determined) priorities are 3, 5, 2, 1, and 4, respectively, with 5 being the highest priority. For each of the following scheduling algorithms, determine the mean process turnaround time. Ignore process switching overhead.
(a) Round robin.
(b) Priority scheduling.
(c) First-come, first-served (run in order 10, 6, 2, 4, 8).
(d) Shortest job first.
For (a), assume that the system is multi programmed, and that each job gets its fair share of the CPU. For (b) through (d), assume that only one job at a time runs, until it finishes. All jobs are completely CPU bound.

Step by Step Solution

3.41 Rating (173 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

For round robin during the first 10 minutes each job gets 15 of the CPU ... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (1 attachment)

Word file Icon

761-C-S-D-B-O-S (317).docx

120 KBs Word File

Students Have Also Explored These Related Operating System Questions!