Question: In 2012, George wright started the Old Oregon Wood Store to man-ufacture Old Oregon tables. Each table is carefully constructed by hand using the highest-
.png)
1. What is the fastest way to manufacture Old Oregon tables using the original crew? How many could be made per day?
2. Would production rates and quantities change significantly if George would allow Randy to perform one of the four functions and make one of the original crew the backup person?
3. What is the fastest time to manufacture a table with the original crew if Cathy is moved to either preparation or finishing?
4. Whoever performs the packaging function is severely underutilized. Can you find a better way of utilizing the four- or five-person crew than either giving each a single job or allowing each to manufacture an entire table? How many tables could be manufactured per day with thisscheme?
100 160 250 275 Preparation ssembly Finishing Packaging (Tom) 80 220 230 PreparationAssemblyFinishing Packa (George) 110 200 280 290 L Preparations AssemblyI Finishing Packaging (Leon) 120 190 290 315 Preparation Asse Finishing- Packaging Cathy) 110 190 290 300 Preparation Assembly FinishingP Packaging
Step by Step Solution
3.23 Rating (158 Votes )
There are 3 Steps involved in it
1 The assignment algorithm can be utilized to yield the fastest time to complete a table Person Job Time Minutes Tom Preparation 100 Cathy Assembly 70 ... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
286-B-M-L-O-M (2591).docx
120 KBs Word File
