Question: In Problem 6, Set 8.1a, suppose that the market demand goal is twice as important as that of balancing the two machines, and that no
In Problem 6, Set 8.1a, suppose that the market demand goal is twice as important as that of balancing the two machines, and that no overtime is allowed. Solve the problem, and determine if the goals are met.
Problem 6
Camyo Manufacturing produces four parts that require the use of a lathe and a drill press. The two machines operate 10 hours a day. The following table provides the time in minutes required by each part:
.png)
It is desired to balance the two machines by limiting the difference between their total operation times to at most 30 minutes. The market demand for each part is at least 10 units. Additionally, the number of units of part 3 may not exceed that of part 2. Formulate the problem as a goal programming model.
Production time in min Part Lathe Drill press
Step by Step Solution
3.19 Rating (174 Votes )
There are 3 Steps involved in it
Minimize Z S 3 S 4 2S 5 2S 6 2S 7 2S 8 2S 9 st 5 X 1 6 X 2 4 X 3 7 X 4 600 3 X ... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
448-M-S-L-P (1517).docx
120 KBs Word File
