Question: In Problem 7, Set 8.1a, suppose that production strives to meet the quota for the two products, using overtime if necessary. Find a solution to
In Problem 7, Set 8.1a, suppose that production strives to meet the quota for the two products, using overtime if necessary. Find a solution to the problem, and specify the amount of overtime, if any, needed to meet the production quota.
Problem 7
Two products are manufactured on two sequential machines. The following table gives the machining times in minutes per unit for two products.

The daily production quotas for the two products are 80 and 60 units, respectively. Each machine runs 8 hours a day. Overtime, though not desirable, may be used if necessary to meet the production quota..
Machining time in min Machine Product ! Produt 2 1 5 3 2 6 2 au
Step by Step Solution
3.44 Rating (157 Votes )
There are 3 Steps involved in it
Assign relatively large weight to the quota Constraint Min Z 100S 1 ... View full answer