Problem 5.83: A temporary dam is constructed in a 5-ft-wide fresh water channel by nailing two boards to pilings located at the sides of the channel and propping a third board AB against the pilings and the floor of the channel. Neglecting friction, determine the reactions at A and B when rope BC is slack.

Problem 5.84: A temporary dam is constructed in a 5-ft-wide fresh water channel by nailing two boards to pilings located at the sides of the channel and propping a third board AB against the pilings and the floor of the channel. Neglecting friction, determine the magnitude and direction of the minimum tension required in rope BC to move board AB.