Question: Problem 5.83: A temporary dam is constructed in a 5-ft-wide fresh water channel by nailing two boards to pilings located at the sides of the
Problem 5.83: A temporary dam is constructed in a 5-ft-wide fresh water channel by nailing two boards to pilings located at the sides of the channel and propping a third board AB against the pilings and the floor of the channel. Neglecting friction, determine the reactions at A and B when rope BC is slack.
Problem 5.84: A temporary dam is constructed in a 5-ft-wide fresh water channel by nailing two boards to pilings located at the sides of the channel and propping a third board AB against the pilings and the floor of the channel. Neglecting friction, determine the magnitude and direction of the minimum tension required in rope BC to move board AB.
1.8 A 3 ft B. 0.9 ft
Step by Step Solution
3.47 Rating (180 Votes )
There are 3 Steps involved in it
PE Pe P 3 P 18 ft 4 12ft First consider the force of the water on the gate P 14p 12A7h Have So that ... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
17-E-M-E-V-M-S (386).docx
120 KBs Word File
