Question: Problem 5.83: A temporary dam is constructed in a 5-ft-wide fresh water channel by nailing two boards to pilings located at the sides of the

Problem 5.83: A temporary dam is constructed in a 5-ft-wide fresh water channel by nailing two boards to pilings located at the sides of the channel and propping a third board AB against the pilings and the floor of the channel. Neglecting friction, determine the reactions at A and B when rope BC is slack.

Problem 5.84: A temporary dam is constructed in a 5-ft-wide fresh water channel by nailing two boards to pilings located at the sides of the channel and propping a third board AB against the pilings and the floor of the channel. Neglecting friction, determine the magnitude and direction of the minimum tension required in rope BC to move board AB.



1.8 A 3 ft B. 0.9 ft

1.8 A 3 ft B. 0.9 ft

Step by Step Solution

3.47 Rating (180 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

PE Pe P 3 P 18 ft 4 12ft First consider the force of the water on the gate P 14p 12A7h Have So that ... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (1 attachment)

Word file Icon

17-E-M-E-V-M-S (386).docx

120 KBs Word File

Students Have Also Explored These Related Mechanical Engineering Questions!