Question: PROBLEM 1 PROBLEM 2 Given the dam below: ( a ) Draw the flownet ( b ) Using zero elevation as the datum, determine the

PROBLEM 1 PROBLEM 2
Given the dam below:
(a) Draw the flownet
(b) Using zero elevation as the datum, determine the head at pt. A;
(c) Determine the uplift pressure at pt. A; and
(d) Compute the flow beneath the dam if the foundation soil is silty sand and the dam is 300 feet long.
Impermeable Laver PROBLEM 3
Given the dam below:
(a) Draw the flownet;
(b) Compute the rate of seepage (in gallons per day per ft) beneath the dam; and
(c) Draw the uplift pressure distribution on the base of the dam (and label its values).
Silty
Sand
el.45
el.0
Shale - Relatively Impermeable Compared to Overlying Silty Sand PROBLEM 4
Given the cofferdam below:
(a) Draw the flownet and compute the rate of seepage (in cfs per ft) into the cofferdam; and
(b) Compute the uplift pressure at pt. A.
Given the dam below:
(a) Draw the flownet;
(b) Using zero elevation as the datum, determine the head at pt. A;
(c) Determine the uplift pressure at pt. A; and
(d) Compute the flow beneath the dam if the foundation soil is silty sand and the dam is 300 feet long.
el.0
Impermeable Laver

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!