Question: Refer to Exercise 10 in Section 10.2. a. Delete any samples necessary to bring the process variation under control. (You did this already if you
a. Delete any samples necessary to bring the process variation under control. (You did this already if you did Exercise 10 in Section 10.2.)
b. Use to estimate Ï (Ï is the difference between X and the 1Ï control limit on an chart).
c. Construct a CUSUM chart, using for the target mean μ, and the estimate of Ï found in part (b) for the standard deviation. Use the values k = 0.5 and h = 4.
d. Is the process mean in control? If not, when is it first detected to be out of control?
e. Construct an chart, and use the Western Electric rules to determine whether the process mean is in control. (You did this already if you did Exercise 10 in Section 10.2.) Do the Western Electric rules give the same results as the CUSUM chart? If not, how are they different?
In Exercise 10.2
.png)
0 10 20 30 40 50
Step by Step Solution
3.54 Rating (164 Votes )
There are 3 Steps involved in it
a No samples need be deleted b The estimate of is A 2 3 The sample size is n ... View full answer