Question: A regular room and pillar method is used in a hard rock leadzinc mine. The ore horizon is at a depth of 360 m where

A regular room and pillar method is used in a hard rock lead–zinc mine. The ore horizon is at a depth of 360 m where the overburden averages 25.2kN/m3. Laboratory tests on core samples (L/D = 2) show that the ore has an unconfined compressive strength of 94.5 MPa and a tensile strength of 8.63 MPa. Find an algebraic expression for the maximum safe extraction ratio, if no size effect exists and a safety factor of 1.75 is required, then evaluate the expression for the given data.

Step by Step Solution

3.46 Rating (153 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

Given Room and pillar mine 360 m depth y252 kNm Co945 Mpa To 863 MPa Find a Safe extracti... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (1 attachment)

Word file Icon

26-E-G-R (240).docx

120 KBs Word File

Students Have Also Explored These Related Geological Engineering Questions!