Question: Site work activities associated with constructing a small bridge are shown in the table below. The table includes the quantity of each activity, the unit

Site work activities associated with constructing a small bridge are shown in the table below. The table includes the quantity of each activity, the unit of measurement associated with each activity, and the unit cost of each activity. Use the data to determine

(a) The total cost for structural excavation

(b) The total cost for the pile-driving rig

(c) The total labor cost for the sitework.

Site work activities associated with constructing a small bridge

Labor Quantity Measurement Unit Cost, S Unit Cost S Unit Cost, S 1.35 Unit of Equipment Material Activity Excavation 1667 Excavation 1.43 120 21.31 5.00 structural Backfill, 340 7.78 1.72 Pile-driving rig Job Piling, steel 2240 5688 3.13 6420 2.93 ls 300 If 16.57 driving Legend: cycubic yard: Ismp sum linear foot

Step by Step Solution

3.47 Rating (160 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

nswer Ttl st f struturl exvtin Lbr st Equiment st M... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (1 attachment)

Word file Icon

217-B-E-M (1595).docx

120 KBs Word File

Students Have Also Explored These Related Economics Questions!