Some young engineers at the local electrical utility are debating ways to lower operating costs. They know that if they can reduce losses, they can lower operating costs. The question is whether they should design for maximum power transfer or maximum efficiency, where efficiency is defined as the ratio of customer power to power generated. Use the model in figure to analyze this issue and justify your conclusions. Assume that both the generated voltage and the customer load are constant.

Rael Power to V gen customer +1)
Step by Step Solution
3.43 Rating (172 Votes )
There are 3 Steps involved in it
Vigent m Rdel V Pload Pgen n V I Vgen IRdel I Vgen ... View full answer