Question: =+20. A construction firm has bid on two different contracts. Let E1 be the event that the bid on the first contract is successful, and

=+20. A construction firm has bid on two different contracts. Let E1 be the event that the bid on the first contract is successful, and define E2 analogously for the second contract. Suppose that P(E1) 5 .4 and P(E2) 5 .3 and that E1 and E2 are independent.