Question: A process is controlled by a P chart using samples of size 100. The center line on the chart is 0.05. What is the probability
A process is controlled by a P chart using samples of size 100. The center line on the chart is 0.05. What is the probability that the control chart detects a shift to 0.08 on the first sample following the shift? What is the probability that the shift is detected by at least the third sample following the shift?
Step by Step Solution
There are 3 Steps involved in it
The PLCL P UCL p 008 is desired N... View full answer