Question: The rework time required for a machine was found to depend on the speed at which the machine was run (A), the lubricant used while

The rework time required for a machine was found to depend on the speed at which the machine was run (A), the lubricant used while working (B), and the hardness of the metal used in the machine (C). Two levels of each factor were chosen and a single replicate of a 23experiment was run. The rework time data (in hours) are shown in the following table.


Treatment Combination Time (in hours) (1) 27 34 38 ab 59 44 40 ac bc 63 abc 37


(a) These treatments cannot all be run under the same conditions. Set up a design to run these observations in two blocks of four

observations each, with ABC confounded with blocks.

(b) Analyze the data.

Treatment Combination Time (in hours) (1) 27 34 38 ab 59 44 40 ac bc 63 abc 37

Step by Step Solution

3.53 Rating (167 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

a b Computer software does not detect any significant effects but the effects for B ... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Applied Statistics and Probability Questions!