A building with a peak load of 2,000 tons and equivalent full load hours of 2,500 hr/year,

Question:

A building with a peak load of 2,000 tons and equivalent full load hours of 2,500 hr/year, determine the most economical option to deliver cooling needs between the two design alternatives.image text in transcribed

Use LCC analysis with a life cycle of 20 years and a discount rate of 5%. Determine the impact of the chiller cost as well as the cost for the chiller water. Specifically, consider two costs for the chiller—$2000/ton and $3000/ton—in addition to $2500/ton. Moreover, vary the rate of the chilled water from $0.08/ton-hr to $0.14/ton-hr.

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Question Posted: