Question: During 1 year a beach eroded 1.2 m to a line 48.3 m from the wall of a building. If the erosion is 0.1 m
During 1 year a beach eroded 1.2 m to a line 48.3 m from the wall of a building. If the erosion is 0.1 m more each year than the previous year, when will the waterline reach the wall?
Step by Step Solution
3.42 Rating (165 Votes )
There are 3 Steps involved in it
Lets denote the distance between the wall of the building and the waterline by x In the first year t... View full answer
Get step-by-step solutions from verified subject matter experts
