a. Sketch possible arrangements for the piping and valves for Figure 14-6. Note that every tank needs

Question:

a.

Sketch possible arrangements for the piping and valves for Figure 14-6. Note that every tank needs to be able to receive fresh washwater or overflow from the next higher letter tank, except for tank F, which receives overflow from tank A or no liquid when offline for the dump and load step. Also, tanks must be able send overflow to overflow product line or to the next lower letter tank, except tank A sends overflow to tank F, or no liquid when offline. Try to minimize the number of valves.


b.

Write a short operational procedure that the operators are supposed to follow.

Figure 14-6

image text in transcribed

Step by Step Answer:

Question Posted: