Question: Develop an administrative estimate for a project involving two buildings with an estimated cost of $7 million each. Both buildings will be constructed at the

Develop an administrative estimate for a project involving two buildings with an estimated cost of $7 million each. Both buildings will be constructed at the same time but on opposite ends of a large site; 2,500 feet apart. Project durations for both buildings are 28 weeks, and they will be done concurrently but have a one-month stagger-start.

Step by Step Solution

3.64 Rating (151 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

Administrative Estimate for a TwoBuilding Project Project Parameters Number of buildings 2 Building cost per building 7 million Total project cost 14 ... View full answer