Question: Looking back at the CIP elevated slab formwork example at the end of the CIP concrete systems section, which of the three estimating options would
Looking back at the CIP elevated slab formwork example at the end of the CIP concrete systems section, which of the three estimating options would be the best choice:
(A) In a budget estimate.
(B) In a GMP.
(C) In a pre-bid day summary estimate.
(D) On bid day, and/or
(E) During buyout?
Step by Step Solution
3.49 Rating (156 Votes )
There are 3 Steps involved in it
To determine which estimating option would be the best choice for the CIP elevated slab formwork exa... View full answer