Question: Utilizing another case study project, prepare a work package for direct labor for a system of work such as concrete foundations, cast-in-place concrete walls, tilt-up
Utilizing another case study project, prepare a work package for direct labor for a system of work such as concrete foundations, cast-in-place concrete walls, tilt-up concrete walls, or slabon-grade. Attach the original portion of the estimate that refers to this work package. Assume the following percentages complete and spent: