Question: Who assumes risks associated with design errors, unforeseen site conditions, cost control, schedule control, quality, and safety with respect to (A) Traditional delivery method and

Who assumes risks associated with design errors, unforeseen site conditions, cost control, schedule control, quality, and safety with respect to 

(A) Traditional delivery method and 

(B) IPD delivery method?

Step by Step Solution

3.33 Rating (150 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

A In the traditional delivery method the risks associated with design errors unforeseen site ... View full answer