Question: 4. As the estimate evolves through the design phase, the accuracy of the estimate should increase and the time required to conduct the estimate decrease.
4. As the estimate evolves through the design phase, the accuracy of the estimate should increase and the time required to conduct the estimate decrease. True or false?